Rose Residences

PROJECT CONCEPT
A Prime Residential Development that captures the New Renaissance Blood.
–  People who want to be ahead of their game
–  People who want to be at the center of it all (Ortigas CBD)
Rose Residences boasts of numerous facilities and amenities
Lot Area: 3,901 sqm.
Total # of Floors: 
21 Levels (top floor: 22nd floor)
16 Residential Floors 
4 Parking levels
1 Ground Floor/Lobby
Number of Units: 892 units
Number of Parking: 224 slots
PROPERTY FEATURES
Location: 
Renaissance Complex, Meralco Ave., Ortigas Center
Amenities:
North and South Wing Amenities, Bramante Amenities, Visitor’s Pay Parking
Unit Variation & Affordability
Studio: 20 sqm to 
Combined unit: 60.64 sqm
LOCATION
Near Major Institutions:
Commercial Centers: 
SM Megamall
Shangri-la Plaza Mall
The Podium
Robinson’s Galleria
Metrowalk
Ortigas Home Depot
Hotels: 
Edsa Shangri-la
Crowne Plaza
Holiday Inn
Discovery Suites
Oakwood Premier Suites
Schools: 
University of Asia and the Pacific (UA&P)
Ateneo de Manila School of Medicine & Public Health
La Salle Greenhills
Saint Pedro Poveda College
Lourdes School of Mandaluyong
St. Paul’s College Pasig
Major Hospitals
Medical City
Cardinal Santos
Financial Institutions: 
Asian Development Bank
Philippine Stock Exchange (Tektite)
Places of Worship: 
Our Lady of Edsa Shrine
St. Francis of Assisi Church
Greenhills Christian Fellowship
Christ Commission Fellowship
 
Download Rose Residences Brochure
 
Download 1 Bedroom Rose Residences Sample Computation
 
Download 2 Bedroom Rose Residences Sample Computation
BUILDING FEATURES
Lobby and reception area24/7 Security and CCTV camerasMailroomHigh-speed elevatorsProperty Management ServicesSwimming PoolsChillscape LoungeFunction RoomsWi-Fi Zones
BRAMANTE AMENITIES
Bramante swimming poolTennis courtSchoolsVarious retail shopsGymFunction roomsParks and gazebosVisitor’s parking
SPECIFICATIONS: BASIC FINISH
Toilet Partition: 
CHB Wall Plastered Plain Cement Finish
Floor Finishes:
Vinyl Tiles for Living, Dining and Sleeping Area
Ceramic Tiles for Toilet and Shower Area
Wall Finishes: 
Painted Finish for Living, Dining and Sleeping Area 
Ceramic Tiles for Shower at 1.2meter high only
Ceiling Finish: 
Concrete slab in painted finish for Living, Dining and Sleeping area 
Painted Finish Ficemboard for T&B Ceiling
Kitchen:
Concrete slab with ceramic tile finish and kitchen sink
Countertop
Toilet & Bath Fixtures:
PVC Door and Frame for Toilet and Bath door
Ceramic Water closet with accessories
Ceramic Lavatory
Shower Set
LICENSES AND PERMITS
BUILDING PERMIT: February 28, 2012
ELTS: ENCRFO 11-07-018: March 05,2012
FINAL LTS and CR Registration: December 2012
PROJECT OFFICERS
Imelda L. Landicho: Project Director
Jess Valentin T. Nunez: Asst Project Director
Engr. Mark Christian Arana: Project Manager
External Project Manager: RM Cabanela Const. Management
General Contractor : DDT Konstruct
Architect: Asya Design
CONSTRUCTION AND TURNOVER SCHEDULE
Mobilization: October 18, 2012
Topping Off: December 2013
Target Turnover: Q3 2015
GROUNDBREAKING: November 14, 2012