Rose Residences
PROJECT CONCEPT
A Prime Residential Development that captures the New Renaissance Blood.
– People who want to be ahead of their game – People who want to be at the center of it all (Ortigas CBD)
Rose Residences boasts of numerous facilities and amenities
Lot Area: 3,901 sqm.
Total # of Floors: 21 Levels (top floor: 22nd floor) 16 Residential Floors 4 Parking levels 1 Ground Floor/Lobby
Number of Units: 892 units
Number of Parking: 224 slots
PROPERTY FEATURES
Location:
Renaissance Complex, Meralco Ave., Ortigas Center Amenities: North and South Wing Amenities, Bramante Amenities, Visitor’s Pay Parking
Unit Variation & Affordability
Studio: 20 sqm to Combined unit: 60.64 sqm
LOCATION
Near Major Institutions:
Commercial Centers:
SM Megamall Shangri-la Plaza Mall The Podium Robinson’s Galleria Metrowalk Ortigas Home Depot
Hotels:
Edsa Shangri-la Crowne Plaza Holiday Inn Discovery Suites Oakwood Premier Suites
Schools:
University of Asia and the Pacific (UA&P) Ateneo de Manila School of Medicine & Public Health La Salle Greenhills Saint Pedro Poveda College Lourdes School of Mandaluyong St. Paul’s College Pasig
Major Hospitals:
Medical City Cardinal Santos
Financial Institutions:
Asian Development Bank Philippine Stock Exchange (Tektite)
Places of Worship:
Our Lady of Edsa Shrine St. Francis of Assisi Church Greenhills Christian Fellowship Christ Commission Fellowship |
BUILDING FEATURES
Lobby and reception area24/7 Security and CCTV camerasMailroomHigh-speed elevatorsProperty Management ServicesSwimming PoolsChillscape LoungeFunction RoomsWi-Fi Zones
BRAMANTE AMENITIES
Bramante swimming poolTennis courtSchoolsVarious retail shopsGymFunction roomsParks and gazebosVisitor’s parking
SPECIFICATIONS: BASIC FINISH
Toilet Partition:
CHB Wall Plastered Plain Cement Finish
Floor Finishes:
Vinyl Tiles for Living, Dining and Sleeping Area Ceramic Tiles for Toilet and Shower Area
Wall Finishes:
Painted Finish for Living, Dining and Sleeping Area Ceramic Tiles for Shower at 1.2meter high only
Ceiling Finish:
Concrete slab in painted finish for Living, Dining and Sleeping area Painted Finish Ficemboard for T&B Ceiling
Kitchen:
Concrete slab with ceramic tile finish and kitchen sink Countertop
Toilet & Bath Fixtures:
PVC Door and Frame for Toilet and Bath door Ceramic Water closet with accessories Ceramic Lavatory Shower Set
LICENSES AND PERMITS
BUILDING PERMIT: February 28, 2012
ELTS: ENCRFO 11-07-018: March 05,2012 FINAL LTS and CR Registration: December 2012
PROJECT OFFICERS
Imelda L. Landicho: Project Director
Jess Valentin T. Nunez: Asst Project Director Engr. Mark Christian Arana: Project Manager External Project Manager: RM Cabanela Const. Management General Contractor : DDT Konstruct Architect: Asya Design
CONSTRUCTION AND TURNOVER SCHEDULE
Mobilization: October 18, 2012
Topping Off: December 2013 Target Turnover: Q3 2015 GROUNDBREAKING: November 14, 2012 |
- Get link
- X
- Other Apps